Wilkinson County:
Halcón George Martens 1H, located on the west side of the south lane of Hwy 61 south of Woodville a couple of miles. Spud 8-8-2014 and completed around the 8th of September. Flowing back.
Halcon Creek Cottage West 1H, H&P Flex 3 Rig #249 completed drilling. Creek Cottage is located on Whitestown Road a couple of miles south of Hwy 24. Fracturing should be taking place soon.
Halcon Rogers 1H, accessed from Hwy 24 west of Centreville about 5 miles. H&P Flex Rig # 249 spud (began drilling) 10-23-2014. Drilling operations are complete and the H & P Flex Rig # 249 appears to have been picked up by Goodrich and is rumored to be drilling the Kinchen 51H-1 in Tangipahoa Parish.
Goodrich CMR-Foster Creek 8-H-1 and 2, access appears to be Hwy 563 down Macedonia Road then on to Helmer Road. Nabors Rig #624 spud -1 on 9-15 and spud -2 on 9-21. Should be completing the drill here soon.
Comstock CMR Foster Creek 28-40 No. 1H, located on Will Floyd Road. Access appears to be south off of Hwy 563 on to Macedonia Road, then on to Netterville Road, then on to Will Floyd Road. Halliburton starting fracturing operations now.
Comstock CMR Foster Creek 30-31 #1H, Trinidad Rig # 103 is reportedly on site, but no confirmation.
Sanchez Morris 1H, RAPAD Rig #31 spud October 13. Accessed from the Pickneyville Road...Traveling west out of Woodville, turn north (right) just past the Old River water tank on to an otherwise private road. (Unless you have business at the oil site, please respect the privacy rights of the landowner.) Drilling completed.
The Bloomer 1H was reportedly next, but Bloomer remains unpermitted and the site has not been completed. Meanwhile the Macedonia site north of Centreville appears ready to go, except for enlargement of a water holding pond, which is in process. I'm guessing RAPAD Rig #31 is headed to the Macedonia.
Sanchez Macedonia (2 wells are permitted...the -1, -2, and another, -4, is applied for...) 2 wells planned for drilling. Macedonia is located on Macedonia Road north of Centreville. Likely accessed south off of Hwy 563 with the site on the west side of Macedonia Road just north of Macedonia Methodist Church.
Amite County:.
Sanchez St. Davis #1, accessed from Hwy 24 in Gloster, located down Kahnville Road about 6 miles southeast of Gloster. This well was drilled above the rubble zone in what may be a TMS record time of about 24 days with a lateral of 5,600’. Flowing back. We will have to wait on a required report to the Mississippi Oil and Gas Board to determine how good of a well it is.
Encana Ash 13H-1 and 13H-2, Located on the east side of Ash Road, accessed via Lower Centreville Road about 3 miles southeast of Centreville. Trinidad Rig #124 spud July 21. Fracking operations should be wrapped up.
Encana Sabine 12H-1 and 12H-2, located off of Enterprise Road, south of Hwy 24 about 3 miles out of Liberty, access is from Hwy 48. Trinidad Rig # 125 spudded 12H-1 on June 20 and 12H-2 on June 23. These wells are flowing back and began producing very early in the process. Signs suggest two good wells.
Goodrich T. Lewis 7-38H-1 located from the same access road as the EnCana Lewis 7-18H-1 off of County Farm Road a mile or so north of the Lower Centreville Road, accessed off of the Greensburg Road, located about 6 miles south of Liberty. Ensign Rig #753 reportedly spud on November 14. Intermediate completed and cemented into place. Drilling below 12,000 foot in the curve at last word.
Encana Longleaf 29H-1 and -2, located off Tobias Lane off of Hwy 584 roughly 3 miles southeast of Liberty. Trinidad Rig # 125 spud -2 on September 30 and -1 on 10/4. -2 has completed drilling in great time (all together reportedly 16 days ahead of schedule for both wells). Awaiting fracturing.
Encana Mathis 29-17H-1, located on the same pad as Mathis 29-32H-1 off of Bean Road west of Gillsburg in south Amite County. Trinidad Rig #124 spud October 17. Completed a 9,169 foot lateral to a total depth of 21,730 foot. Fracturing should begin here soon.
EnCana Lawson 25-13H-1, located on the same pad as the Lawson 25H-1 in Downtown Gillsburg, MS in Southeast Amite County will be drilled by Trinidad Rig #124.
EnCana McIntosh 15H/Reese 16H, Located on Chance Road off of Ewell Road south of Hwy 24 a few miles east of Centreville, this double unit pad was set to have 4 wells drilled, but it is rumored legal issues may limit the drill to 2 wells in one unit while drilling none in the other. I have been unable to learn which unit will be drilled and which one will not. Trinidad Rig #125 is setting up here now.
Pike County: A permit has been approved for 1 Sanchez unit and is pending for 2 units applied for by both Sanchez and VirTex.
St. Helena Parish:
Comstock Meeks 56 HZ-1, located on Martin Lane north of Hwy 38 off of Hwy 441, just south of the Mississippi line and the Encana Lawson 25H-1. Trinidad Rig # 103, now located in Wilkinson County, is scheduled for this site once 2 wells are completed in Wilkinson County.
St. Tammany: Permit pending.
Washington Parish: Permits pending, site preps completed. Note the latest permitted unit in Tangipahoa Parish, the Goodrich B-Nex 43H-1, will nose over into Washington Parish.
Tangipahoa:
Goodrich Verberne 5H-1, located south of Hwy 38 on Hwy 1061. Nabors X-17 spud 8-25. Completed total drill of 18,938 foot. Flowing back and is rumored to be a very good one.
Goodrich Williams 46H-1 has the Ensign Rig #753 spud 9/11. Completed total drilling depth of 18,650 foot. Reportedly fractured 20 stages successfully…should be flowing back soon.
Halcon Franklin PST Prop H-1, H&P rig # 623 spud November 1. Access to this site is from downtown Osyka, Mississippi on South Railroad. As of December 1, restarted the drill with a side track at 11,500 foot and was at 11,668 foot. (Had earlier drilled to 16,230 foot, but experienced hole integrity issues forcing the sidetrack.
Goodrich Kent 41H-1, Nabors X-17, located on Monroe Stevens Road, accessed via Hwy 440/1057 to Hwy 1058 to B Brown Road, then to Monroe Stevens Road. Spud November 5. As of December 1, drilling at 17,228 foot. However, rumors are they may be wrapping up the drill very shortly with plans to move to the B Nez 43H unit late next week.
Goodrich Kinchen 58H-1, accessed from Hwy 1053 about 1 mile north of Kentwood off of Hwy 51. H&P Flex Rig 3 # 249 spud this week.
Goodrich B Nez 43H -1 and -2, which is permitted for 2 wells, is located on the south side of Hwy 38 east of Kentwood about 8 miles and nearly to the Washington Parish line. The nose of this northeasterly tilted unit is actually in Washington Parish. Reportedly the Nabors X-17 will be moving here from the Kent 41H site the latter part of next week.
East Feliciana: Permits in process…
West Feliciana:
Halcon Walker drill, previously scheduled, has been delayed.