Your TMS Information Source Since 2012

Have a TMS tip? Share it here and keep up with latest on our Facebook Page or Twitter!

July

The Friday Report - 7/11/14

Posted by admin on July 11, 2014

TMS Pre-production Report.

Wilkinson County:

Halcon Blackstone 4H-2, located roughly halfway between Centreville and Woodville on the south side of Hwy 24. Fracturing operations underway...should be completed shortly.

Halcon Fassman 9H-1, truck access road is located off Hwy 61 onto Sam Leake Road, then to Whetstone. H&P Flex3 Rig # 623 spudded May 29. Drilling away in the curve...completion is likely a couple of weeks out, yet.

Halcon S D Smith, located on the Jackson Louisiana Road south of Woodville. H&P Flex 3 Rig# 249 spudded June 9, 2014. Drilling away!

Goodrich CMR Foster Creek 24-13, access from Hwy 24 on Hiram McGraw Road to Macedonia Road, then to end of Helmer Road. Nabors Rig # 624 spudded May 30. Drilling in the curve. Intermediate casing in place.

Goodrich CMR/Foster Creek 31-22H-1, access from Hiram McGraw Road off of Hwy 24. Nabors X-17, Spudded July 8, surface casing in place.

Sanchez Dry Fork Creek # 2H, RAPAD Rig # 31 spudded May 21, 2014. Drilling complete, total depth of abut 18,200'. Should be moving soon to St. Davis #1 site located on Kahnville Road south of Gloster, MS.

EnCana Pintard 28H-2, located roughly 3 miles north of Centreville off Macedonia Road- Trinidad Rig # 124 finished drill with 20,807' total depth and an approximate lateral length of 8,500'.

Amite County:

Encana Lewis 7-18H-1, located about 1 mile north of the Lower Centreville Road off of the County Farm Road roughly 7 miles south of Liberty. Twenty-nine successful fractures, 8,000' lateral, plugs drilled out...awaiting flow back.

Encana Lyons 35H-2- Located on same site as Lyons 35H-1, Trinidad Rig # 125 - drill reportedly completed around June 11 with about a 5,000' lateral. Preparing for fracturing operations following completion of Blackstone 4H frac job.

Encana Sabine 12H-1 and 12H-2, located off of Enterprise Road, south of Hwy 24 about 3 miles out of Liberty, access is from Hwy 48. Trinidad Rig # 125 spudded 12H-1 on June 20 and 12H-2 on June 23. Both wells appear to have drilled to intermediate depth and casing appears to be put into place today.

EnCana Mathis 29-32H-1, Located on the Louisiana line due south of the Anderson 17H unit, just off of Bean Road in T1N, R5E. Well completed with stages, flowing back. Awaiting production report.

Goodrich Bates 25-24H-1, located roughly 2 miles northeast of Liberty off of Hwy 569 North, Ensign Rig # 753 spudded May 12.
Goodrich reported this well had reached total depth as of Monday, July 7. Still on site. Ensign Rig # 753 is expected to be assigned to the Spears 31-6H-1 to be drilled from the recently completed C H Lewis 30-19H site.

Goodrich Denkmann 33-28H-2, located in Amite County on the Mississippi/Louisiana line in T1N, R4E. Accessed from the Louisiana side through Weyerhaeuser roads off of Tolar Hurst/Parish Road 181 off of Hwy 1044 north of Hwy 38. Nabors X-17 spudded May 23. Completed drilling in 25 days with an approximate lateral of 6,200'. Preparing for fracturing operations. Nabors moving to CMR/Foster Creek 31-22H-1 in Wilkinson County.

St. Helena Parish-

East Feliciana-

Goodrich Beech Grove 94H-1- Located about 4 miles east of Wilson, LA off of Carruth Road was reported with a 672 barrels per day of oil initial production rate. This is a bit disappointing, but story is that there are few natural fractures under the Beech Grove to enhance the artificial fracturing. Negative is lower initial production...possible positive is a slower drop in production over time.

West Feliciana-

Goodrich SLC 81H-1- Ensign Rig #751. Located off of Walker Road via LA Hwy 421 north of and about 12 miles from Jackson, LA. Fracturing operations underway.



What do you think about it?