Wilkinson County:
EnCana Pintard 28H-1, located roughly 3 miles north of Centreville off Macedonia Road- Awaiting flow back.
Halcon Horseshoe Hill 11-22H-1, located roughly 1 mile south of the intersection of Coon's Mill Rd and Hwy 24 about 4 miles east of Woodville-Drill completed with a 7,751' lateral. Schlumberger should be finished with the 32 stage frack early next week.
Halcon Blackstone 4H-2, located roughly halfway between Centreville and Woodville on the south side of Hwy 24, H&P FlexRig# 249 drilling away, should be drilling in the lateral, but no official word.
Halcon Fassman 9H-1, access road is located north of Hwy 24 off of Leake's Road via Coon's Mill Rd. Brand spanking new H&P Flex3 Rig # 623 or 625 setting up on site.
Goodrich CMR Foster Creek 24-13, access from Hwy 24 on Hiram McGraw Road to Macedonia Road, then to end of Helmer Road. Nabors Rig # 624 should be spudding soon, if not already.
Sanchez Dry Fork Creek #2H, RAPAD Rig # 31 spudded May 21, 2014, Access via Whetstone Road off of Hwy 563, north of Woodville.
Amite County:
Encana Lewis 7-18H-1, located about 1 mile north of the Lower Centreville Road off of the County Farm Road roughly 5 miles south of Liberty. Trinidad Rig #124 in a 35 (34?) day drill time, reached total depth on May 23 at 20,547' and a total lateral of 8,077', 2nd only to the Anderson 18H-1, but drilled a LOT faster. Congratulations, guys!
Encana Lyons 35H-1-Located 2 miles east of Centreville, north of Hwy 48, just west of Pepper House Rd- Flow back started. Awaiting report.
Encana Lyons 35H-2- Located on same site as Lyons 35H-1, Trinidad Rig # 125 - Reportedly drilling in the curve.
EnCana Mathis 29-32H-1, Located on the Louisiana line due south of the Anderson 17H unit, just off of Bean Road in T1N, R5E. Trinidad Rig # 125 reportedly drilled in record time of 30 days. Schlumberger should begin an estimated 5,500' 22 stage frack operation next week.
Goodrich C.H. Lewis 30-19H-1- located north of Bates School Road 1/2 mile west of Paul Honea Road in T2N, R6E, Amite County, MS. Well is producing. Flare is glowing in the night sky.
Expect an IP announcement in early June.
Goodrich Nunnery 12-1H-1 -Located on the east side of Claude Smith Road, along Pike County line, about 3 miles west of Magnolia-Total depth of 17,526'. Halliburton should complete a 22 stage fracture over the weekend.
Goodrich Bates 25-24H-1, located roughly 2 miles northeast of Liberty off of Hwy 569 North. Spudded May 12, drilling away at 10500'.
Goodrich Denkmann 33-28H-2, located in Amite County on the Mississippi/Louisiana line in T1N, R4E. Accessed from the Louisiana side through Weyerhaeuser roads off of Tolar Hurst/Parish Road 181 off of Hwy 1044 north of Hwy 38. Nabors X-17 Rig Spudded May 17.
EnCana Lawson 25H-1- Reported initial production of around 500 barrels per day. Awaiting official well report.
St. Helena Parish-
Goodrich Weyerhaeuser 51H-Located about 2 miles west of Chipola- Goodrich reported on Monday March 24 this well would not be a good one and that they were still working on the flow back. Awaiting official report.
East Feliciana-
Goodrich Beech Grove 94H-1- Located about 4 miles east of Wilson, LA off of Carruth Road. Drilling complete. Halliburton should begin fracking operations middle to late next week.
West Feliciana-
Goodrich SLC 81H-1- Ensign Rig #751, Intermediate casing in place, drilling at 13,796' as of May 19.
For the record, that is 9 rigs in operation. 4 in Amite County, 4 in Wilkinson County and 1 in West Feliciana Parish.
Tenth rig should be on site in July or as soon as possible, according to Comstock.