Friday Report - October 24, 2014
TMS PRE-PRODUCTION UPDATE 10-17-2014
Wilkinson County:
Halcón Fassman 9H-1, truck access road is located off Hwy 61 onto Sam Leake Road, then to Whetstone. Well is flowing back from a reported 6,030 foot lateral. I was told this week that Halcon only reports well results each quarter. This would explain a lot. However, I must point out that Halcon did deliver a between quarters report on its first well, which, so far, has been its highest IP well to-date.
Halcón Shuckrow 10H-1, located on Sam Leake Road about 5 miles east of Hwy 61 has finished drilling. I’ve been told Platinum is no longer fracking for Halcon and that Frac Tech is now finishing the Shuckrow.
Halcón S D Smith 1H, located on the Jackson Louisiana Road south of Woodville. H&P Flex 3 Rig# 249 completed a 7,556' lateral. Flowing back. I was told this week not to expect a report on this well until the quarterly report is given. See a link to all operating company report dates and times at the bottom of this report.
Halcón George Martens 1H, located on the west side of the south lane of Hwy 61 south of Woodville a couple of miles. Spud 8-8-2014 and completed around the 8th of September. Targeted lateral length was 7,000 foot. No one has reported whether a fracking crew has arrived at the George Martens. Rumors are we may be seeing Schlumberger coming back for this well. If not, then Frac Tech is the most likely candidate once the Shuckrow is finished.
Halcon Gaulden 1H, located on Louis Gaulden Road about 4 miles east of Hwy 33 roughly 3 miles south of Centreville. H&P Rig # 623 spud on September 10. Last word was they may be sidetracking to redrill the lateral. It was also reported the H&P Rig # 623 upon completion will likely be moving to the Franklin PST Prop H-1 site in Tangipahoa Parish just south of Osyka off Hwy 51.
Halcon Creek Cottage West 1H. H&P Flex 3 Rig #249 completed drilling this well earlier this week. The rig has moved to the nearby Rogers well site. The Creek Cottage is located on Whitestown Road a couple of miles south of Hwy 24. Awaiting fracturing operations. Originally reported here in error that the Halcon Creek Cottage East 1H was also being drilled. The pad is set for drilling this well when scheduled.
Halcon Rogers 1H, accessed from Hwy 24 west of Centreville about 5 miles. H&P Flex Rig # 249 set up on site as of today. Should be spud soon.
Goodrich CMR Foster Creek 24-13, access from Hwy 24 on Hiram McGraw Road to Macedonia Road, then to end of Helmer Road. Goodrich Petroleum announced on Monday, September 29, "The Company is currently conducting completion operations on its CMR/Foster Creek 24-13H-1 (97% WI) well in Wilkinson County, Mississippi, which has an approximate 6,600 foot lateral with 24 frac stages and should begin flowback within a week." Well results here will be made known at the 3rd quarter report, likely to be given in early November.
Goodrich CMR-Foster Creek 8-H-1 and 2, access from 24 on Hiram McGraw Road to Macedonia Road, then a mile or so down Helmer Road. Nabors Rig #624 spud -1 on 9-15 and spud -2 on 9-21. Drilling away.
Sanchez Dry Fork East # 2H – An October 23 announcement by Sanchez reported, “Dry Forks East #2 achieved a 24 hour IP of 712 BOE/D, 89% oil, accounting for the high, 1,500 MMBtu, natural gas stream based upon an industry standard of 6:1.” This converts to 634 barrels of oil per day.
Comstock CMR Foster Creek 28-40 No. 1H, located on Will Floyd Road. Access appears to be south off of Hwy 563 on to Macedonia Road, then on to Netterville Road, then on to Will Floyd Road. Trinidad Rig #103 began drilling on August 14. Rumors and questions abound on this well. It has reportedly finished drilling, but all we hear is a deafening sound of silence.
Sanchez Morris 1H, RAPAD Rig #31 spud October 13. Accessed from the Pickneyville Road...Traveling west out of Woodville, turn north (right) just past the Old River water tank on to an otherwise private road. (Unless you have business at the oil site, please respect the privacy rights of the landowner.) Drilling away.
Amite County:
Sanchez St. Davis #1, accessed from Hwy 24 in Gloster, located down Kahnville Road about 6 miles southeast of Gloster. RAPAD Rig #31 spud 9-2-2014. This well was drilled above the rubble zone in what may be a TMS record time of about 24 days with a lateral of 5,600’. Fracturing operations are underway.
Encana Ash 13H-1 and 13H-2, Located on the east side of Ash Road, accessed via Lower Centreville Road about 3 miles southeast of Centreville. Trinidad Rig # 124 spud July 21. Both wells completed and awaiting fracturing, presumably as soon as Sabine fracturing operations are completed.
Encana Sabine 12H-1 and 12H-2, located off of Enterprise Road, south of Hwy 24 about 3 miles out of Liberty, access is from Hwy 48. Trinidad Rig # 125 spudded 12H-1 on June 20 and 12H-2 on June 23. Fracking operations is completed on one well and should be completed on the 2nd well shortly. FTC International (a/k/a Frac Tech) has been doing the honors.
Goodrich Spears 31-6H-1 is located on the recently completed C H Lewis site pad on the west side of Bates School Road north of Gillsburg. The 7,600 foot lateral has been fracked and began flowing back mid-week. Early results from this well should be known by 3rd quarter report for Goodrich.
Goodrich T. Lewis 7-38H-1 located from the same access road as the EnCana Lewis 7-18H-1 off of County Farm Road a mile or so north of the Lower Centreville Road, accessed off of the Greensburg Road, located about 6 miles south of Liberty. Nabors X-17 or Ensign Rig #753 will be moving on site once drilling is completed on current wells in Tangipahoa Parish.
Encana Longleaf 29H-1 and -2, located off Tobias Lane off of Hwy 584 roughly 3 miles southeast of Liberty. Trinidad Rig # 125 spud -2 on September 30 and -1 on 10/2 or 10/3. No report this week. Completed drilling one intermediate and working on 2nd one last week. I would expect the 2nd intermediate to be completed by now.
Encana Mathis 29-17H-1, located on the same pad as the Mathis 29-32H-1 off of Bean Road west of Gillsburg in south Amite County. Trinidad Rig # 124 spud October 17. Surface casing in place and drilling the vertical below 9,000 foot.
EnCana Lawson 25-13H-1, located on the same pad as the Lawson 25H-1 in Downtown Gillsburg, Mississippi. It appears Trinidad Rig # 124 will once again be serving as the Gillsburg Christmas Tree!
Pike County: Permits pending.
St. Helena Parish:
Comstock Meeks 56 HZ-1, located on Martin Lane north of Hwy 38 off of Hwy 441, just south of the Mississippi line and the Encana Lawson 25H-1. No word on what’s happening with the Comstock drills or confirmation of where Trinidad Rig # 103, now located in Wilkinson County, will be headed next…anyone with news, please share.
St. Tammany: Permit pending.
Washington Parish: Permits pending, site preparation underway.
Tangipahoa:
Goodrich Verberne 5H-1, located south of Hwy 38 on Hwy 1061. Nabors X-17 spud 8-25. As per Goodrich news release on 9-29, "Verberne 5H-1 (66% WI) well in Tangipahoa Parish, Louisiana... has an approximate 6,800 foot lateral and reached total depth within 29 days." Reportedly putting production casing in place and preparing to cement. If true, this rig should be moving next week to either the T. Lewis 7-38H-1 site in Amite County or to the Kent 41H-1 site a bit further south in Tangipahoa Parish. Latest word is Kent site will likely be the winner…we shall see.
Goodrich Williams 46H-1 has the Ensign Rig #753 spud 9/11. Intermediate completed. Drilling at 13,521’ as of 10/20. This rig will be moving either to the T. Lewis 7-38H-1 site in Amite County or to the Kent 41H-1 site a bit further south in Tangipahoa Parish, whichever the X-17 leaves open.
Halcon Franklin PST Prop H-1, H&P rig # 623, will be moving to the Franklin PST Prop H-1 site south of Osyka in the Greenlaw Field. This site is east of Hwy 51 “behind Skinny’s”, I’m told. Skinny’s being an eating establishment well known to the area.
Goodrich Kent 41H-1, Nabors X-17 should move on site the week of Ocober 26-November 1. Site is located, I'm told on Monroe Stevens Road, accessed via Hwy 440/1057 to Hwy 1058 to B Brown Road, then to Monroe Stevens Road.
East Feliciana: Permits in process…
West Feliciana:
Halcon Walker drill, previously scheduled, has been delayed.
Please note the upcoming 3rd quarter report schedule may be viewed here:
/index.php/tms-news/2014-news/october-2014/3rd-quarter-reporting-schedule-tms-operating-