Friday Report 09-26-2014
TMS PRE-PRODUCTION UPDATE 09-26-2014
Wilkinson County:
Halcón Fassman 9H-1, truck access road is located off Hwy 61 onto Sam Leake Road, then to Whetstone. Well is flowing back from a reported 6,030 foot lateral. Expect an announcement on this well’s production in the near future.
Halcón Shuckrow 10H-1, located on Sam Leake Road about 5 miles east of Hwy 61 has finished drilling and Premier should begin fracking on this well shortly, if it hasn’t already.
Halcón S D Smith 1H, located on the Jackson Louisiana Road south of Woodville. H&P Flex 3 Rig# 249 completed a 7,556' lateral. Premier has completed the frac. Plugs have been drilled out. Flow back should begin this weekend.
Halcón George Martens 1H, located beside the west side of the south lane of Hwy 61 south of Woodville a couple of miles. Spud 8-8-2014 and completed around the 8th of September. Targeted lateral length was 7,000 foot. Waiting to be fracked after Shuckrow.
Halcon Gaulden 1H, located on Louis Gaulden Road about 4 miles east of Hwy 33 roughly 3 miles south of Centreville. H&P Rig # 623 spud on September 10. Drilling away.
Halcon Creek Cottage East 1H and Creek Cottage West 1H. H&P Flex 3 Rig #249 is set up on this dual pad site, located on Whitestown Road a couple of miles south of Hwy 24. It is believed the first well spud (began drilling) this week.
Goodrich CMR Foster Creek 24-13, access from Hwy 24 on Hiram McGraw Road to Macedonia Road, then to end of Helmer Road. A roughly 6,600 foot lateral and 23 of 24 stages were successfully fracked. Expect plug drill out shortly with flow back to begin sometime next week.
Goodrich CMR-Foster Creek 8-H-1 and 2, access from 24 on Hiram McGraw Road to Macedonia Road, then a mile or so down Helmer Road. Nabors Rig #624 spud -1 on September 15.
Goodrich CMR/Foster Creek 31-22H-1, accessed from Hiram McGraw Road off of Hwy 24. Nabors X-17, Spud July 8. Drill reportedly finished in 35 days or less. All twenty-four stages completed on a roughly 6,700 foot lateral. Expect well flow back soon, if not already.
Sanchez Dry Fork East # 2H, drilling completed (again) with a 5,000 foot lateral. Rapad Rig#31 moving to Amite County St. Davis #1 site located on Kahnville Road south of Gloster, MS. Fracked 19 stages successfully. Plugs drilled. Well is flowing back. Expect early production numbers in a couple of weeks.
EnCana Pintard 28H-2, located roughly 3 miles north of Centreville off Macedonia Road- Trinidad Rig # 124 finished drill with 20,807' total depth and an approximate lateral length of 8,500'. Well is flowing back and it is reportedly a very good well. By the way, Pintard 28H-1 has had some difficulties and been offline for a couple of months now. We’re hoping that will change soon, but no word on it back going again, yet.
Comstock CMR Foster Creek 28-40 No. 1H, located on Will Floyd Road. Access appears to be south off of Hwy 563 on to Macedonia Road, then on to Netterville Road, then on to Will Floyd Road. Trinidad Rig #103 began drilling on August 14. Intermediate cemented in place to kick off point…drilling at 11,000 feet.
Sanchez Morris #1H, RAPAD Rig #31 is expected to move to this site, located about 3 miles west of Woodville, likely the end of next week.
Amite County:
Sanchez St. Davis #1, accessed from Hwy 24 in Gloster, located down Kahnville Road about 6 miles southeast of Gloster. RAPAD Rig # 31 spud 9-2-2014. Rumors are this well has reached total depth in a TMS record time of about 24 days…no word on lateral length. Plans appear to be to move RAPAD Rig #31 to Morris #1H about 3 miles west of Woodville.
Encana Ash 13H-1 and 13H-2, Located on the east side of Ash Road, accessed via Lower Centreville Road about 3 miles southeast of Centreville. Trinidad Rig # 124 spud July 21. Ash -2 has reached total depth. Ash -1 is at 17,000+ feet. I expect this rig to be finished drilling soon…best guess plans are a move to Mathis 29-17H-1.
Encana Lyons 35H-2- Located on same site as Lyons 35H-1. Fracturing operations complete on an estimated 5,000 foot lateral. Plugs drilled out. Flow back underway...rumors abound, but most reliable I have heard is this well could easily have a peak production number in excess of 1,200 barrels per day.
Encana Sabine 12H-1 and 12H-2, located off of Enterprise Road, south of Hwy 24 about 3 miles out of Liberty, access is from Hwy 48. Trinidad Rig # 125 spudded 12H-1 on June 20 and 12H-2 on June 23. Core sample operations have consumed a lot of time, but drilling on the actual holes themselves occurred in record time and is reportedly complete. The rig has moved to Longleaf 29H site. Expect fracking to begin in early October.
Goodrich Spears 31-6H-1 is located on the recently completed C H Lewis site pad on the west side of Bates School Road north of Gillsburg. Ensign Rig #753 spud July 22. Drilling completed with a 7,600 foot lateral around August 28. Fracking should begin after the Goodrich CMR Foster Creek 24-13H-1 frack job is completed.
Goodrich Bates 25-24H-1, located roughly 2 miles northeast of Liberty off of Hwy 569 North. Fracking successfully completed on 19 of 19 stages in an approximate 5,000 foot lateral. Plugs drilled out and well is flowing back. I expect an IP announcement on this well early Monday morning...it should be above 900 barrels.
Encana Longleaf 29H-1 and -2, located off Tobias Lane off of Hwy 584 roughly 3 miles southeast of Liberty. Trinidad Rig # 125 setting up over the weekend.
Encana Mathis 29-17H-1, located on the same pad as the Mathis 29-32H-1 off of Bean Road west of Gillsburg in south Amite County, is expected to be hosting Trinidad Rig #124 in a couple of weeks.
Pike County: Permits pending.
St. Tammany: Permit pending.
Washington Parish: Permits pending, site preparation underway.
Tangipahoa:
Goodrich Verberne 5H-1, located south of Hwy 38 on Hwy 1061. Nabors X-17 spud 8-25. Drilling away into the lateral.
Goodrich Williams 46H-1 has the Ensign Rig #753 spud 9/11. Drilling at 2,630 feet as of 9/23.
St. Helena Parish: Comstock pad being prepared...permit pending.
East Feliciana: Permits in process…
West Feliciana:
Halcon Walker drill, previously scheduled, has been delayed.
TMS Wealth Management Conference was a huge success!