Halcon George Martens, et. al., # 2H
Halcon’s George Martens, et. al. #2H in Wilkinson County, according to the Form 3 available online from the Mississippi Oil and Gas Board, began producing on November 19 and had production for 12 days in November of 8,366 barrels of oil for an average production of 697 barrels of oil per day.
The official flow test of this well on December 1, the 13th day of flow back, had a 24 hour production of 855 barrels of oil using a 15/64 choke and with a 2,375 psi well head pressure.
The lateral length was 5,340 foot.